Page 1 of 1

Pass/Fail result

Posted: Wed Mar 19, 2025 3:35 pm
by x4Trace
When you start a process (execute an operation), you can pass parts through the operation with results.

This operation has two possible results: pass (P) and fail (F).
The code and result can also come from the PLC, terminal, or another device. This sample is with a terminal.
processresult.png
processresult.png (82.8 KiB) Viewed 439 times
When a product (PH-00000) passes the operation, it is passed to the Packaging operation. To pass the product, you have to select the pass result, type/read the code, and press the "Record" button.

When a product (PH-00001) fails the operation, it is wasted. To fail the product, select the fail result, type/read the code, and press the "Record" button.